Technical Lead
Chubb External
Oracle Cloud Mexico Posted Nov 26, 2026 Full Time
DataSenior
About this role
The Technical Lead is the senior technical authority for all data engineering work within Rate Factory. Given the decision to orient this role toward Data Engineering, its mandate is to design, govern, and guarantee the integrity of the data layer that Rate Factory consumes — from raw source ingestion through to Gold Layer publication — while providing technical leadership to the Data Engineer Sr. and coordinating with the broader engineering squad (Full Stack Developer, Quality Engineer) on integration contracts and data schemas.
Focus
The Gold Layer Architectural ownership
Rate Factory's pipeline begins at the Gold Layer. The Pricing team and the broader engineering squad cannot design or build any component until the Gold Layer is formally certified as production-ready, its schema is documented, and its data contracts are agreed. This architectural work requires a senior engineer with deep knowledge who can own the end-to-end data layer design.
The 15-step tariff pipeline has complex data integration points that require senior ownership.
The Rate Factory process involves multiple systems handing data off at precise points — source extraction, transformation, Gold Layer loading, schema validation, pricing engine consumption, output storage, and audit trails. The Tech Lead must define and own the data contracts at each handoff, ensure data quality gates are enforced, and resolve integration issues as they arise during development and in production. This requires someone who can speak authoritatively to both the data platform team and the delivery engineering squad.
There is no existing D&A resource available at this seniority level.
The current D&A team in México does not have available capacity at the Tech Lead level. Existing senior engineers are fully committed to Portfolio+, Claims transformation, and platform operations. Absorbing Rate Factory's technical leadership needs into existing capacity would create unacceptable risk for both Rate Factory and the ongoing initiatives it depends on.