Skip to content
Browse live jobs
UL Solutions External

Project Engineer

UL Solutions External

Oracle Cloud
Bangalore, Karnataka, India Posted Oct 12, 2026 Full Time
Engineeringr

About this role

Job Description: Wind Resource Assessment is an important step in wind farm development. In this role, the  Project Engineer is required to work mainly on the following areas and also with Peers on the daily job not limited to Site Identification, Meteorological tower design, installation and management, wind data analysis, turbine layout optimization, energy production estimation, losses and uncertainty analysis, and preparation of bankable reports.   Learn and work in energy assessments and wind resource modeling techniques in a global renewable consulting company Optimize turbine layouts Perform energy production studies Prepare bankable reports Interact and work with regional teams across the company for overseas projects Site Visits and travel to inspect met towers and wind projects Attend conferences and industry meetings   Duties and Responsibilities Learn and work in energy assessments and wind resource modeling techniques in a global renewable consulting company Optimize turbine layouts Perform energy production studies Prepare bankable reports Interact and work with regional teams across the company for overseas projects Site Visits and travel to inspect met towers and wind projects Attend conferences and industry meetings Qualifications Bachelor’s/Masters degree in Engineering(Mechanical, Electrical) Minimum of 6+ years of relevant experience with a background in wind resource assessment, met mast installation, power curve testing, etc. Expertise with software applications such as Windographer, openWind, R, Microsoft Excel, etc. Experience with IEC 61400-12-1 standard Fluent communication skills in written and spoken English. Ability to work as part of a team and share ideas with peers to solve the client's pain points Willingness to travel (site visits, conferences, meetings) Wind Resource Assessment is an important step in the wind farm development. In this role, the Project Engineer is required to work mainly on the following areas and also with Peers on the daily job not limited to Site Identification, Meteorological tower design, installation and management, wind data analysis, turbine layout optimization, energy production estimation, losses and uncertainty analysis, preparation of bankable reports. Wind Resource Assessment is an important step in the wind farm development. In this role, the Project Engineer is required to work mainly on the following areas and also with Peers on the daily job not limited to Site Identification, Meteorological tower design, installation and management, wind data analysis, turbine layout optimization, energy production estimation, losses and uncertainty analysis, preparation of bankable reports.

More current roles in the same field and location.