Skip to content
Browse live jobs
Kardex

Integration Manager

Kardex

Workday
Cincinnati Posted Oct 2, 2026 Full Time
OtherManagergo

About this role

The Integration Manager is responsible for ensuring Kardex Solutions projects transition successfully from implementation into stable customer operations with the lowest possible level of post-go-live support issues. This role serves as the operational bridge between Project Management, Solution Engineering, Software, Controls, Commissioning, Customer Support, and the customer’s operational and IT teams. The Integration Manager becomes actively involved before system go-live and remains engaged through the early operational life of the solution, with particular focus on the first six months after deployment. The primary objective of the role is to ensure that systems are not simply technically complete, but are operationally ready, properly integrated, fully documented, effectively handed over, and capable of being supported efficiently after launch. The Integration Manager will help identify implementation risks before go-live, coordinate system-level validation, ensure support teams understand the deployed solution, and drive rapid resolution of recurring issues during the stabilization period. Success in this position will directly improve: • Customer satisfaction • System stability • First-six-month support performance • Project-to-service handoff • Issue resolution speed • System availability • Customer adoption • Internal accountability • Long-term serviceability Your tasks Key ResponsibilitiesDeployment ReadinessLead a structured deployment-readiness process before customer go-live. Confirm that the complete integrated solution is prepared for operational use, including: Mechanical systemsControlsAutoStoreConveyorPeripheral equipmentSoftwareWMS/WCS/WES interfacesHost integrationsNetwork infrastructureUser accessOperational workflowsSupport documentationEnsure outstanding technical, operational, and integration risks are clearly identified before launch. Establish and maintain a formal Go-Live Readiness Checklist for each assigned project. Identify unresolved issues that could create operational disruption after go-live and drive ownership and closure before the system enters production. System Integration CoordinationCoordinate system-level integration across all technology components included within the Kardex Solutions scope. Typical systems may include: AutoStoreConveyor and sortationGoods-to-person technologiesAMRs or AGVsRoboticsKardex software platformsWCS/WESPLC and controls systemsCustomer WMS or ERP platformsShipping systemsPrint-and-apply systemsScanners and identification systemsThird-party automationEnsure that interfaces between systems are properly defined, tested, documented, and understood by the teams responsible for ongoing support. The Integration Manager does not necessarily develop every interface or control sequence but is accountable for ensuring the entire integrated solution functions as intended. Integration TestingCoordinate and support structured testing prior to production launch. Testing should include, where appropriate: Interface testingEnd-to-end transaction testingOrder lifecycle testingInventory transactionsReplenishment workflowsPicking workflowsPacking workflowsException handlingEquipment fault recoveryCommunication interruptionsHost-system interruptionsRecovery proceduresPeak throughput testingStress testingUser acceptance testingEnsure testing represents realistic customer operating conditions, rather than isolated equipment functionality. Maintain clear documentation of test results, open issues, responsibilities, and corrective actions. Operational ReadinessWork with the customer and internal teams to ensure the operation is prepared to successfully use the system. Validate that: Standard operating procedures are establishedOperators are trainedSupervisors are trainedMaintenance teams are trainedCustomer IT teams understand integration dependenciesException processes are definedEscalation procedures are documentedSpare parts requirements are establishedSystem monitoring is operationalSupport contacts are clearly definedEnsure the customer understands how to operate the solution during both normal and abnormal conditions. Service & Support HandoffOwn the transition of the deployed system from the project organization to the Kardex Solutions support organization. Ensure the support team receives complete and accurate system information before taking operational responsibility. Required handoff documentation may include: Final system architectureEquipment listsNetwork architectureIP addressingSoftware versionsPLC versionsConfiguration filesIntegration specificationsInterface mappingsCustomer contactsVendor contactsWarranty informationSpare parts listsKnown issuesTroubleshooting proceduresEscalation pathsProject-specific operational considerationsConduct a formal Project-to-Support Handoff Review before the system enters steady-state support. Go-Live SupportCoordinate Kardex Solutions resources during system launch and the initial production period. Establish clear responsibilities across: Project ManagementEngineeringSoftwareControlsCommissioningCustomer SupportThird-party suppliersCustomer operationsCustomer ITEnsure critical issues are quickly assigned to the correct resource and are not delayed because ownership is unclear. Support structured daily or weekly go-live reviews depending on the complexity and maturity of the deployment. Six-Month Stabilization PeriodMaintain oversight of project performance during the first six months following go-live. Monitor: Support ticket volumeRepeat issuesSystem availabilityEquipment faultsSoftware incidentsInterface failuresOperational exceptionsCustomer escalation volumeResponse timeResolution timeIdentify trends rather than treating each support ticket as an isolated event. Drive root-cause investigations for recurring or high-impact issues. Ensure permanent corrective actions are implemented rather than relying on temporary workarounds. Root Cause & Continuous ImprovementLead or coordinate structured root-cause analysis for significant or recurring deployment issues. Methods may include: 5 Why analysisFault-tree analysisFailure mode analysisIssue trendingPareto analysisLog analysisSystem performance reviewsIdentify whether issues originated from: Solution designEngineeringSoftwareControlsConfigurationInstallationCommissioningTrainingOperational proceduresCustomer infrastructureThird-party systemsEnsure lessons learned are documented and incorporated into future projects. Project Lessons LearnedConduct a formal lessons-learned review approximately 90–180 days after go-live. Capture findings related to: Design assumptionsIntegration requirementsSoftware configurationCommissioningTestingTrainingCustomer readinessSupport documentationThird-party dependenciesOperational performanceWork with Engineering, Product Management, Project Management, and Service to convert recurring lessons into standardized improvements. The goal is not simply to solve individual project issues, but to prevent the same issues from occurring on future projects. Customer RelationshipServe as a trusted technical and operational resource during the transition from project implementation to stable operations. Communicate clearly with customer stakeholders regarding: System statusOpen issuesRoot causesCorrective actionsOperational risksResolution timelinesSupport responsibilitiesMaintain appropriate urgency while ensuring customer expectations remain realistic and aligned with contractual responsibilities. Cross-Functional CollaborationThe Integration Manager will work closely with: Project ManagementSolution EngineeringMechanical EngineeringElectrical EngineeringControls EngineeringSoftware EngineeringCommissioningCustomer SupportField ServiceProduct ManagementSalesCustomer ITCustomer OperationsThird-party suppliersThe role should provide a single system-level perspective across teams that may otherwise be focused on individual components. Key Performance IndicatorsSuccess in this role should be measured primarily by the quality and stability of projects following deployment. Recommended KPIs include: Number of support incidents during first 30, 90, and 180 daysRepeat incident rateCritical incident rateSystem availability during stabilizationMean time to resolutionPercentage of issues resolved permanently versus temporarilyPercentage of projects completing formal support handoff before go-livePercentage of projects completing operational-readiness reviewsOpen issues at go-liveCustomer escalations during first six monthsCustomer satisfaction following deploymentLessons-learned actions implementedReduction in recurring issues across successive projectsA particularly useful primary metric could be: Support incidents per deployed system during the first six months of operation. This provides a direct indication of whether deployment quality is improving. QualificationsRequired Experience7+ years of experience in warehouse automation, systems integration, industrial automation, software integration, project delivery, commissioning, or technical support.Experience supporting complex automated systems after deployment.Strong understanding of integrated material handling systems.Experience troubleshooting issues that cross multiple technical disciplines.Ability to understand system architecture and data flow.Strong customer-facing communication skills.Demonstrated ability to coordinate technical teams during critical project periods.Strong organizational and issue-management skills.Preferred ExperienceExperience with one or more of the following is strongly preferred: AutoStoreConveyor systemsSortationAS/RSGoods-to-person systemsAMRs / AGVsPLC controlsIndustrial networksWMSWCSWESERP integrationWarehouse softwareSQL or system log analysisAPI or message-based integrationsMaterial handling systems integrationExperience with large, multi-technology automation projects is highly desirable. Technical CompetenciesThe successful candidate should understand: System architectureWarehouse material flowControls architecturePLC systemsIndustrial communicationsSoftware interfacesHost-system integrationWMS/WCS/WES architectureTransaction flowsNetwork dependenciesException handlingTroubleshooting methodologySystem availabilityRoot-cause analysisCommissioning processesAcceptance testingThe Integration Manager does not need to be the deepest technical specialist in every discipline but must possess enough technical knowledge to connect issues across disciplines and drive the appropriate teams toward resolution. Professional SkillsThe ideal candidate is: Highly accountableDetail orientedProcess drivenTechnically credibleCalm under pressureComfortable working directly with customersAble to coordinate multiple technical disciplinesStrong at identifying risks before they become issuesPersistent in driving problems to permanent resolutionEffective at communicating complex problems clearlyComfortable challenging teams when requiredFocused on continuous improvement rather than assigning blameTravelApproximately 30–50% travel may be required depending on project activity. Travel will primarily support: Pre-go-live readiness reviewsIntegration testingSystem commissioningCustomer go-livesOperational stabilizationSignificant troubleshooting activitiesLessons-learned reviews Role in the Kardex Solutions Project LifecycleThe Integration Manager should become involved before commissioning is complete, not after support problems begin. A recommended lifecycle is: Design → Build → Integrate → Test → Operational Readiness → Go-Live → Stabilize → Handoff → Optimize The Integration Manager's primary ownership begins during Integration and Testing and continues through approximately six months after go-live. During that period, the Integration Manager ensures the system transitions from a completed project into a stable, supportable, production-ready customer solution. Primary MissionMake every Kardex Solutions deployment easier to operate and easier to support than the one before it. The Integration Manager is successful when the customer reaches stable operations quickly, the support organization receives a clean handoff, recurring issues are eliminated, and the first six months of operation require minimal reactive support. Your profile

More current roles in the same field and location.